All Systems Operational
Venko Total Group · System Health Status
Real-time operational status, regional enclave telemetry, zero-knowledge solvency verifications, and SOC 2 CC6.1 compliance guarantees across all global enclaves.
Global Availability SLA
99.98%
Rolling 30-day Uptime AverageSLO Error Budget Remaining
94.2%
Target 99.98% SLO Window SLO Burn Rate
0.08x
Nominal Burn VelocitySolvency Reserve Ratio
150.0% Groth16
BN254 SNARK Proof VerifiedCI Release Readiness
19/19 PASSED
Automated Release Gate AssertionsRegional Enclave Infrastructure Health
4 / 4 Enclaves OperationalUS-East (Virginia)
Code: us-east-112ms
100.0% Uptime
EU-Central (Frankfurt)
Code: eu-central-124ms
99.98% Uptime
SA-East (São Paulo)
Code: sa-east-118ms
99.99% Uptime
AP-East (Tokyo)
Code: ap-northeast-142ms
99.95% Uptime
90-Day System Uptime History
100% Operational Status (Past 90 Days)90 Days AgoToday (100% Uptime)
System Component Health
6 / 6 Services OperationalVenko Core Coordination Engine
US-EAST Enclave OPERATIONALSLA: 99.99%
ZK Solvency Verification Kernel
Groth16 BN254 Circuit OPERATIONALSLA: 100.0%
Paymaster Velocity Controls
Fail-Closed Gating OPERATIONALSLA: 100.0%
SMTP SLA Delivery Gateway
Multi-Provider Relay OPERATIONALSLA: 99.85%
Adaptive Video Streaming CDN
6 Locales / 24 Asset Variants OPERATIONALSLA: 100.0%
Platform CI Release Gates
19/19 Certified Assertions OPERATIONALSLA: 100.0%
Incident & Maintenance Log (Past 90 Days)
2026-Q3 Scheduled Maintenance(MAINTENANCE)
SOC 2 Type II audit trail validation & ZK circuit key refresh completed smoothly.
Duração: 45mCOMPLETED
2026-Q3 Regional Chaos Drill(DRILLS)
Simulated Paymaster rate-limit breach and validated fail-closed regional velocity controls.
Duração: 12mRESOLVED
2026-Q2 Upgrade Milestone(MAINTENANCE)
Paymaster velocity anomaly governance engine & RLS enclave guards deployed.
Duração: 30mCOMPLETED